OFF-GRID SOLAR-POWERED WATER WELL IMPROVEMENT
This project was implemented to improve the pumping rate, and total yield, of an off-grid, solar-powered water well. The improvements included the design and installation of a tank farm, secondary solar array, and solar pumping inverter. The daily pumping yield was increased by ~50% as a result.
Pacific Coast Engineering performed a system design and ROI analysis, followed by a detailed Bill of Materials (BOM) and contractor selection. Our project management services then coordinated the scheduling, and scope of work, of the water well, solar and general contractors involved.
Deliverables
Tools & technology
Duration: three months, from initial specification gathering to system commissioning.